Greg Newby: 07/14/2011 4:28 PM EDT
|
|
Action: |
Update
Priority changed from 2 to 1
|
|
Greg Newby: 06/19/2011 7:00 PM EDT
|
|
Comment: |
Joel, please republish as #184. Thanks.
|
|
Action: |
Update
Assigned To changed from Greg Newby to Joel Replogle
Status changed from AD Review to Ready to Publish
|
|
|
Andre Merzky: 06/15/2011 7:35 AM EDT
|
|
Comment: |
also attach source files
|
|
Attachment: |
occi-infrastructure.tgz
(636.13 KB)
|
|
Action: |
Update
Added an attachment.
Status changed from Closed to Pending
|
|
Andre Merzky: 06/15/2011 7:34 AM EDT
|
|
Comment: |
attached pdf of final version.
|
|
Attachment: |
infrastructure.pdf
(366.32 KB)
|
|
Action: |
Update
Added an attachment.
|
|
Greg Newby: 04/29/2011 6:25 PM EDT
|
|
Action: |
Move
Moved from Submit OGF Draft to Published
Category changed from Recommendations Track to Community Practice
Group changed from Infrastructure to none (no value)
resolution set to Accepted
Status changed from GFSG Review: 15-day final to Closed
|
|
Joel Replogle: 04/07/2011 2:06 AM EDT
|
|
Comment: |
Published as GFD.184 on 2011-04-07.
|
|
Action: |
Update
|
|
Greg Newby: 04/01/2011 7:32 PM EDT
|
|
Comment: |
Thanks. I believe this is scheduled for discussion on April 4.
|
|
Action: |
Update
|
|
|
Greg Newby: 03/14/2011 5:13 PM EDT
|
|
Comment: |
This is now in final standards council review
|
|
Action: |
Update
Assigned To changed from Richard Hughes-Jones to Greg Newby
Status changed from Author Action Needed to GFSG Review: 15-day final
|
|
|
Greg Newby: 02/07/2011 12:25 PM EST
|
|
Comment: |
Authors/editors: public comment is complete. Please address any comments in the public comment, either in this tracker, a new document, or the PC
tracker.
When the document is ready for final standards council review, please post an update here, and/or email. Thanks.
|
|
Action: |
Update
Assigned To changed from Joel Replogle to Richard Hughes-Jones
Priority changed from 3 to 2
Status changed from Public Comment Period to Author Action Needed
|
|
Greg Newby: 01/10/2011 12:19 PM EST
|
|
Comment: |
Note from the January 3 standards council telecon: it's important to have a robust security concerns section in this document.
|
|
Action: |
Update
|
|
|
Greg Newby: 11/22/2010 11:30 AM EST
|
|
Comment: |
Update from OGF:
The OCCI documents are still being worked, anticiping feature freeze soon
|
|
Action: |
Update
|
|
|
Thijs Metsch: 11/22/2010 9:58 AM EST
|
|
Comment: |
After some substantial changes this is the new version of the infrastructre document. Please release asap into public comment together with the OCCI
Core document.
|
|
Attachment: |
infrastructure.pdf
(361.29 KB)
|
|
Action: |
Update
Added an attachment.
|
|
Greg Newby: 06/03/2010 8:21 AM EDT
|
|
Comment: |
Usually we only pre-assign numbers if there is a need for within-document/between-document references. Is this something you need? Or, are you
generating from LaTex os somesuch?
Please email me newby@arsc.edu, since I don't always get updates from GridForge. It's no problem to pre-assign if that is what is needed.
|
|
Action: |
Update
|
|
Thijs Metsch: 06/01/2010 6:21 AM EDT
|
|
Comment: |
Can you provide me with the doc number for this document?
Thanks,
-Thijs
|
|
Action: |
Update
|
|
|
Greg Newby: 04/13/2010 10:30 AM EDT
|
|
Comment: |
Reassigning to Andre as AD, since he has been more engaged with the group.
|
|
Action: |
Update
|
|
Greg Newby: 04/13/2010 10:29 AM EDT
|
|
Comment: |
Reassigning to Andre as AD, since he has been more engaged with the group.
|
|
Action: |
Update
|
|
Greg Newby: 03/30/2010 4:21 PM EDT
|
|
Comment: |
Public comment period is complete. Please review the comments (and for companion documents). You can submit a final copy of your document, if
desired, based on comments.
Please email me, or set the tracker back, when you believe the document is ready for the next step (final review).
|
|
Action: |
Update
Assigned To changed from Joel Replogle to Richard Hughes-Jones
Priority changed from 3 to 2
Status changed from Public Comment Period to Author Action Needed
|
|
|
Greg Newby: 01/14/2010 2:34 PM EST
|
|
Comment: |
Per the standards council, and with the adjusted document, this is now headed for 60-day public comment. Authors/editors, please solicit comments
from your constituents.
Also, please upload the source document (not just the PDF).
|
|
Action: |
Update
Assigned To changed from Richard Hughes-Jones to Joel Replogle
Priority changed from 4 to 3
Status changed from GFSG Review: Initial to Public Comment Period
|
|
Thijs Metsch: 01/13/2010 3:16 AM EST
|
|
Comment: |
Made changes according to comments from board.
|
|
Attachment: |
occi-infrastructure.pdf
(33.16 KB)
|
|
Action: |
Update
Added an attachment.
|
|
Greg Newby: 12/10/2009 6:44 PM EST
|
|
Comment: |
Thanks. This and the other OCCI documents are in 15-day review by the standards council, for discussion in the December 22 telecon or as soon as may
be.
After that, the recommendations track documents will go for 60-day public comment.
For this document, the front matter is not formatted as we prefer (see the sample documents in the Editor project page, or existing published
documents). Can you provide an editable copy?
|
|
Action: |
Update
Assigned To changed from Greg Newby to Richard Hughes-Jones
Priority changed from 2 to 4
Status changed from Public Comment Period to GFSG Review: Initial
|
|
|