Description: |
The MSC proposed we measure our performance based on the following:
Group charter milestones achieved, particularly for specifications outlined in TSC document.
Adoption plan established for each specification outlined in our TSC document.
5 interoperability fests completed for OGF specifications during 2006/7.
Use Cases structure established and top Use Case Patterns integrated with TSC. (e.g. use cases correlated with specs).
Questions:
1) Do we agree to these?
2) What actions needed to meet these?
|